Chubu Centrair International Airport Terminal 2

2019

Chubu Centrair International Airport opened Terminal 2 for LCCs use in September 2019. i Design inc. had supervised the sign design of Terminal 2. Also, the signs of Terminal 1 was updated with the opening of Terminal 2.

The Departure Lobby

The Departure Lobby

The Arrival Lobby Entrance

The Arrival Lobby Entrance

The Terminal General Information Sign

The Terminal General Information Sign