2019 Chubu Centrair International Airport opened Terminal 2 for LCCs use in September 2019. i Design inc. had supervised the sign design of Terminal 2. Also, the signs of Terminal 1 was updated with the opening of Terminal 2. The Departure Lobby The Arrival Lobby Entrance The Terminal General Information Sign