New Chitose Airport : International terminal extension

2020

New Chitose Airport International terminal building extension was completed in March 2020.
i Design cooperated on its sign design.

New arrival gate at the second floor in the renovation area

New arrival gate at the second floor in the renovation area

New Departure gate at the third floor in the extension area

New Departure gate at the third floor in the extension area

Curbside Lobby at the first floor in the extension area

Curbside Lobby at the first floor in the extension area