New Chitose Airport : International terminal extension 2020 New Chitose Airport International terminal building extension was completed in March 2020. i Design cooperated on its sign design. New arrival gate at the second floor in the renovation area New Departure gate at the third floor in the extension area Curbside Lobby at the first floor in the extension area